CJ Brown Dam Riprap Overlay
2630 Croft Rd, Springfield, OH 45503
Posted inContract Number: W912QR-13-D-0027
Client: USACE, Louisville District
Cost: $531,337.00 (at award); Final Contract Value $531,337.00
Award Date: 9/29/2014
Contract Completion Date: 5/1/2015
This project was a Task Order on the USACE, Louisville District SDVOSB MATOC. The CJ Brown Dam had an original Riprap project that was performed in 2008 on the lower elevation. This project was to add overlay on the upper portions of the bank. In total there were 6,200 linear feet of embankment that need Type C Riprap overlay to two feet of thickness.